Installing the skirting board
New tile, new flooring, and a new kitchen in general? Of course, updated baseboards will be needed as well. Today we will talk about its installation. As already mentioned, the installation of the floor plinth is the finishing touch in the finishing works, because it gives the interior a complete, ennobled look. It is known that the most luxurious repair will not be presentable, if there will be visible gaps between the wall and the floor. To hide them, this is what the skirting board is for. Moreover, it becomes a real lifesaver, capable of hiding small defects in the floor finish.
Among the varieties of skirting boards, the plastic one is the most popular for many reasons. Polyvinyl chloride is famous for its durability and strength. The service life of plastic floor strips reaches a century. They are resistant to fire and moisture, safe, so they can be installed in any room. Baseboards are easy to install, cut with a sharp knife, and their cost is not high. If you like, you can compare them to wood and plaster planks, plastic has flexibility. Their color palette is huge, which does not limit the choice of colors of the interior of the room and allows you to fit in with the overall background. An additional plus is the completion of some models, a special groove in which to lay wires.

Wondering what components make up the baseboard? Surprised? Yes, there are quite a lot of them for such a seemingly trifling thing as a baseboard plate.
Quality installation of baseboards is not possible without these components:
  • 1
    External and internal corners, which is used to connect the slats in the corners of the room
  • 2
    The skirtings are designed to decorate the edges of the plinth. They come as a set and can be left and right
  • 3
    Connections — a detail with two slots, which serves to join and extend the slats
  • 4
    Fasteners, designed to fix the skirting board to the wall
Next we go through the list. How do you fix the skirting board to the wall? The strips are mounted with screws, clips or liquid nails. For fixing on nails and clips, you usually need tools such as a drill with different sizes of drill bits, a screwdriver, a tape measure, fasteners, a metal saw and a vacuum cleaner.

How much material and fittings to take is a good question. As they say, by eye and finger in the sky can not determine, here you need accurate calculations. Before the installer will mount the pvc skirting board, he must measure the length of the walls. To this number is usually added 1.5-2 meters and divide the resulting amount by 2.5 meters (the length of the plank). Rounding the resulting number upwards, we get the number of slats.
Now the fun part — installation (installation) of the skirting board.

When installing on a dowel-nail plank with a dressed corner attached to one of the corners of the room. It is best to start with the longest wall. Angle put evenly, so that when you install it was not a warp. The specialist will mark on the wall at 5-6 inches from the corner of the place of attachment. If the walls are flat, the marks are made at a distance of 40 centimeters from each other. If there are gaps, reduce the fastening step. The next step is to make small holes with a perforator. It is necessary to take into account that the dowel must enter 30 millimeters into the wall, and if the surface is uneven, dowel number 6 is taken. Then the dust is removed and dowels are hammered into the holes. The skirting board is placed against the wall and the marks made are transferred to it. Then the holes are drilled. The heads of the screws or nails must be completely immersed in the plank. To do this, make notches with a drill bit of large size.
The last step is fixing the baseboard to the wall with nails. The nails are covered with stoppers that match the color. The plugs can be glued for a more secure attachment. Mounted slats are already adjusted to the right size. They are usually cut with a sharp knife or hacksaw, so they do not crack. In this case the sharp corners are preserved. Also, when cutting the edge strips, take into account that the plugs will take 3-5 millimeters. If a professional uses connectors, he installs them before fixing.

Then all that remains is to run the cable under the baseboard and it's done.
Our company ASA Luxe group offers turnkey construction and repair services. We undertake all the work on the preparation of the object, the selection of building materials and will realize all your wishes
Contact us for a project






France

980, Avenue du Peyrat 83310 Grimaud

+33 6 22 35 19 05
+33 6 26 55 03 40
Subscribe
© 2022 ASA LUXE GROUP